03/28/03 - 04/??/03

Construction 4

03/28/03  some studs are up for the wall, and some of the plates are in around the dyno
I have a banner
04/09/03  the sheet rock is up
the sheet rock is up on the other wall, too
the exhaust ventilation system is in
the counter is almost done
I didn't like the cart - now I have a workstation (it looks better with the wires coiled up)
the walls are painted
full frontal view
text
text
text