03/28/03 - 04/??/03
Construction 4
![]() |
| 03/28/03 some studs are up for the wall, and some of the plates are in around the dyno |
![]() |
| I have a banner |
![]() |
| 04/09/03 the sheet rock is up |
![]() |
| the sheet rock is up on the other wall, too |
![]() |
| the exhaust ventilation system is in |
![]() |
| the counter is almost done |
![]() |
| I didn't like the cart - now I have a workstation (it looks better with the wires coiled up) |
![]() |
| the walls are painted |
![]() |
| full frontal view |
| text |
| text |
| text |